§04 · LAB LOG · WHAT ACTUALLY MOVED

The lab, 2026-09-30.

Daily records use America/New_York calendar days. Work, preparation, review, and publication dates stay separate.

LAB/2026-09-30 // SIGNAL CLEAR

2026-09-30

Lab log — 2026-09-30

prepared retrospectively from retained evidence by Codex; work date 2026-09-30 (America/New_York); prepared 2026-10-27; retrospective entry approved for publication by Asif; published 2026-10-27 (America/New_York) — absentbornlabs.org

The Build worker queue had an installation recorded, and its database integrity check passed. A separate static UI release recorded matching asset readbacks and 86 browser checks at desktop and narrow widths.

Retrospective evidence audit — 2026-10-27

The browser count is from the coordinator release, not rerun during this audit. UI and endpoint success do not prove worker execution or autonomous upkeep. Physical-phone behavior and field performance remained unqualified.

What did not ship

  • This reconstruction makes no claim beyond the dated evidence above.
  • Missing execution, deployment, or acceptance evidence remains unknown; it is not replaced by activity counts.

Next

Close the narrowest remaining evidence boundary with a dated source and its relevant failure control before expanding this day's claims.

Raw telemetry

  • dated event: 2026-09-30T18:21:30-04:00 (America/New_York)
  • verification class: REPORTED; retained source inspected retrospectively
  • publication of this retrospective entry: 2026-10-27 (America/New_York)